Tera Apartments
Kirkland, WA
Mixed-Use Development

Tera has 161 luxury apartment units in three separate buildings over structured parking with 226 stalls and 8,100sf of street level retail.

The land development required the demolition of existing buildings, large excavation, and placement of utilities.

Mego Construction completed Tera on schedule and within budget.

Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
Sold:
Central Building LLC
Curtis Beattie & Associates
Mego Construction, Inc.
$19 Million
December 1999
2003





Belle Arts Apartments
Bellevue, WA
Mixed-Use Development

Belle Arts has 128 luxury apartment units in two separate buildings over two levels of secured parking. Street level retail consists of three spaces totaling 8,000sf.

The land development required the demolition of five existing houses, excavation, and placement of utilities.

Mego Construction completed Belle Arts on schedule and within budget.

Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
111-108th LLC
Driscoll Architects
Mego Construction, Inc.
$13 Million
October 2000





The Shelby
Seattle, WA
Mixed-Use Development

The Shelby has 98 luxury apartment units over 2.5 levels of structured parking with 5,000sf of prime downtown street retail in Seattle’s desirable “Belltown” neighborhood.

This downtown Seattle urban infill project consisted of demolishing existing buildings, creating shoring systems, large excavation and placement of utilities.

Mego Construction completed The Shelby on schedule and within budget.

Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
CD One LLC
Driscoll Architects
Mego Construction, Inc.
$19 Million
June 2001





The Bristol at Southport
Renton, WA
Mixed-Use Development

The Bristol at Southport has 188 luxury view apartment units in four separate buildings over two levels of structured parking joined together by a lushly landscaped courtyard and water feature. There is 7,300sf of street level retail and 217 feet of waterfront.

This project is located within the waterfront community of Southport and directly adjacent to the 62-acre Gene Coulon Beach Park.

Mego Construction completed The Bristol on schedule and within budget.


Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
The Bristol at Southport LLC
Mithun
Mego Construction, Inc.
$25 Million
March 2002





click for larger image

Southport
Renton, WA
Site Development

Southport is located on the shores of the south end of Lake Washington at the site of the old Shuffleton Steam Plant. This 17.5-acre land development included erosion control, placement of water utilities, constructing an underground concrete water quality vault and site preparation for a 750,000sf Class “A” office facility, 40,000sf of commercial/retail/restaurant space with over 400 luxury apartment units and a 220-unit luxury waterfront hotel.



Owner:
General Contractor:
Construction Costs:
Completed:
Southport LLC
Mego Construction, Inc.
$1.2 Million
November 2001






click for larger image

Juanita enton, WA
Site Development

Southport is located on the shores of the south end of Lake Washington at the site of the old Shuffleton Steam Plant. This 17.5-acre land development included erosion control, placement of water utilities, constructing an underground concrete water quality vault and site preparation for a 750,000sf Class “A” office facility, 40,000sf of commercial/retail/restaurant space with over 400 luxury apartment units and a 220-unit luxury waterfront hotel.



Owner:
General Contractor:
Construction Costs:
Completed:
Southport LLC
Mego Construction, Inc.
$1.2 Million
November 2001






click for larger image

Juanita Village
Kirkland, WA
Site Development

Juanita Village is a mixed-use development on 11.5-acres in Kirkland. A 30,000sf grocery store and adjacent strip mall were demolished prior to putting erosion control systems in place, constructing two concrete underground storm detention tanks, placing utilities and laying a pad ready site development for a bank, free standing Starbucks, Walgreen’s store, a 200-unit residential project and a 6,500sf retail strip development.

Juanita Village has a total of 583 residential units and over 70,000sf of retail.




Owner:


Architect:
General Contractor:
Construction Costs:
Completed:
Baldridge Development, Inc.
Juanita Village LLC
SECO Development, Inc.
GGLO
Mego Construction, Inc.
$3.5 Million
November 2002









Chelsea at Juanita Village
Kirkland, WA
Mixed-Use Development

Mego performed the construction of 196 luxury residential units in three separate buildings with 20,000sf of street level retail and a subterranean concrete parking garage for 275 cars.

There are several outdoor landscaped courtyards that tie the community together.

Mego Construction completed Chelsea on schedule and within budget.


Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
Juanita Village 6 LLC
GGLO
Mego Construction, Inc.
$24 Million
December 2002






The Gardens at Town Square
Bellevue, WA

Suites Remodel Conversion of 12 one bedroom units into six residential suites. All work was done while the 171-unit retirement facility was in operation.



Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
The Gardens at Town Square LLC
Curtis Beattie & Associates
Mego Construction, Inc.
$283,000
March 2000







First Horizon Bank
Bellevue, WA
Retail Development

A new retail banking center was built out inside the existing mixed-use project, Belle Arts.



Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
First Horizon Bank
F. Brown & Associates
Mego Construction, Inc.
$337,000
January 2001







Inglewood Golf & Country Club
Kenmore, WA
Golf Club Development

A multiple building maintenance facility for equipment and ground crews for a private 18-hole golf course.




Owner:
Architect:
General Contractor:
Construction Costs:
Completed:
Inglewood Golf & Country Club
George Ostrow
Mego Construction, Inc.
$283,000
July 2001








Seattle Opera New Parking
Seattle, WA
Parking Development

A new parking lot on a former building site with new storm detention utilities, site work, landscaping/irrigation and parking for 40 cars.





Construction Costs:
Completed:
January 2001
Confidential









Rosario Resort
Orcas Island, WA

Renovation Interior restoration of the historic Moran mansion.




Owner:
General Contractor:
Completed:
Rosario Resort
Mego Construction, Inc.
2002





click for larger image





The Bristol at Southport II
Renton, WA
Mixed-Use Development

The Bristol at Southport II has 195 luxury view apartment units in three separate buildings over two levels of structured parking. There will be 12,653sf of prime retail.

This project is located within the waterfront community of Southport and directly adjacent to the 62-acre Gene Coulon Beach Park.

The project is currently under construction.





Owner:
Architect:
General Contractor:
Construction Costs:

Building C at Southport LLC
Mithun
Mego Construction, Inc.
$29 Million